Expert Knowledge Base
Fitout Hub
Expert guidance and answers to your questions
All Questions
37 questions
Commercial office fitout costs are driven by the total floor area, the starting condition of the space, the level of finishes, and the complexity of building services. The difference between a base build and a turnkey delivery significantly impacts the...
Read More
Office fitouts in Melbourne typically cost between $550 and $3,000 plus GST per square metre. The final investment depends on whether a business requires a budget open plan setup or a premium executive environment. Total project costs are heavily influenced...
Read More
A commercial office fitout typically consists of 11 stages, starting from the initial consultation and brief through to the final IT and AV technology setup. Decisions made during the early space planning stage have the most significant impact on the...
Read More
Yes, commercial construction in Victoria requires a registered building practitioner. This licence is issued by the Victorian Building Authority (VBA). The specific licensing requirements depend on whether the project involves structural changes, new services, or simple cosmetic updates. VBA registration...
Read More
Office fitout timelines depend on the size of the space, with small offices taking 1 to 2 weeks, medium offices taking 3 to 6 weeks, and large or complex projects taking 6 to 16 weeks. These durations refer to the...
Read More
Commercial office fitouts in Melbourne typically cost between $550 and $3,000 plus GST per square metre. The final cost depends on the specification level, ranging from basic open plan setups to high end executive environments. The total budget must account...
Read More
Make-good obligations are legal requirements in a commercial lease to restore a tenancy to an agreed condition before the lease ends. This process typically involves removing the business fitout and repairing damage before handing the keys back to the landlord....
Read More
Office refurbishment updates existing finishes and fittings without making structural changes. Office renovation involves changing the internal layout, modifying services, or altering the building structure. The primary distinction is whether the project alters the physical footprint and internal services or...
Read More
An office refurbishment updates existing finishes and fittings without structural change, whereas an office renovation modifies the layout, services, or structural elements of the space. The choice between the two depends on whether the existing space is simply outdated or...
Read More
A professional office fitout company manages the entire process under one roof, including design, construction, electrical, plumbing, flooring, furniture, and project management. This end to end approach removes the need for business owners to coordinate multiple separate contractors. Managing a...
Read More
An office fitout specialist is a commercial contractor that manages the process of turning an empty or outdated shell into a functional workspace. They provide end to end services including design, construction, services installation, and furniture procurement. The primary value...
Read More
Modern office requirements are shifting away from individual desk dominance toward collaborative zones. Floor space devoted to individual desks is dropping from previous levels of 60 to 70 percent down to 40 to 50 percent. The exact space required depends...
Read More
The office design process involves initial space planning for layout and flow, followed by design development for finishes and furniture, and concludes with a detailed proposal and building permit approvals. Decisions made during the space planning phase are critical because...
Read More
Yes, it is possible to renovate an office while the business remains operational. Progressive Corporate uses flexible working hours and tailored schedules to ensure minimal impact on daily business operations. The key to an occupied renovation is a carefully planned...
Read More
Design and approvals typically take 6 to 10 weeks before construction begins. Total timelines vary based on the scope of the renovation, required building permits, and landlord approvals. Underestimating the pre-construction phase is the most common cause of project delays...
Read More
Yes, Progressive Corporate provides industrial fitouts, specialising in the design and construction of office and amenity spaces within warehouses and distribution centres. The layout of an industrial fitout must align with your revenue model because every design decision impacts operational...
Read More
Office fitouts in Melbourne typically cost between $550 and $3,000 plus GST per square metre. The final price depends on whether you require a basic open plan setup or a high end executive fitout. Total project costs are driven by...
Read More
Glass partitions are a high value investment for Melbourne businesses that need private offices without losing natural light. They are a core feature of mid range and executive fitouts to provide a professional, open feel. The primary trade off is...
Read More
Office partitions range from full glass systems for meeting rooms to desk dividers and panel screens for workstation privacy. These systems allow businesses to create enclosed offices, partial cubicles, or dedicated seating areas without requiring full renovation services. The choice...
Read More
A commercial office fitout is the process of converting an empty or outdated space into a functional working office. It encompasses all necessary additions, including flooring, walls, lighting, furniture, and cabling. The total scope of work varies significantly based on...
Read More
Practical completion triggers a final inspection to create a defects list and the handover of all essential project documentation. This phase transitions the project from the construction team to the tenant for relocation and occupancy. The success of this transition...
Read More
Progressive Corporate manages the end-to-end process for relocating businesses, including design, construction, and project management. We coordinate every stage from the initial brief to the final move to ensure the new office is ready for occupation. The most expensive mistakes...
Read More
An office refurbishment includes updating finishes, fittings, and furniture to resolve dysfunction in an existing commercial space. This typically covers aesthetic upgrades, new furniture installations, and layout refinements without requiring a full ground up build. The key distinction is that...
Read More
An office refurbishment involves updating the finishes and fittings of a commercial space without making structural changes. This typically includes new furniture installations, partition updates, and aesthetic improvements to resolve dysfunctional layouts. Refurbishments are generally more affordable than constructing a...
Read More
A commercial office fitout turns a shell or outdated space into a functional workplace, while a refurbishment updates finishes and a renovation alters the layout, services, or structure. The primary distinction lies in whether the project modifies the building's core...
Read More
Almost every commercial office fitout in Victoria requires a building permit. Commercial construction also requires a registered building practitioner licensed by the Victorian Building Authority (VBA). The specific permit requirements depend on whether you are modifying the building structure and...
Read More
Choose a fitout company based on their ability to provide transparent cost per square metre data, a clear project programme, and full turnkey delivery. The best partners offer an initial design review to lock in scope before quoting. The most...
Read More
A small office under 50sqm typically takes 1 to 2 weeks, while medium offices from 50 to 200sqm take 3 to 6 weeks. Larger or complex fitouts over 200sqm usually take between 6 to 16 weeks to complete. Physical construction...
Read More
To get a quote for an office fitout in Melbourne, call Progressive Corporate on (03) 8203 2606, visit the Knoxfield showroom, or use the online form. We provide a free design and layout review with no obligation to establish an...
Read More
Demountable partitions are non-structural wall systems that can be relocated or removed without affecting the building structure. They allow business owners to modify office layouts without the need for permanent construction. The choice of a demountable system is often driven...
Read More
Yes, office partitions can be removed, and most Melbourne leases require this as part of make-good obligations. You must return the tenancy to its original condition as it was at lease commencement. The requirement to remove partitions usually depends on...
Read More
A comprehensive office fitout quote should include design, project management, and construction costs such as partitions, flooring, and services. It typically excludes IT hardware, external branding, relocation costs, and temporary accommodation. Do not assume a service is covered unless it...
Read More
A Category A fitout is the basic infrastructure provided by a landlord to make a space ready to lease. A Category B fitout is the custom tenant installation that adds the specific partitions, furniture, and branding required for a business...
Read More
An office fitout company manages the entire project lifecycle from the initial brief and space planning through to construction and final handover. This includes coordinating designers, managing builders, and delivering essential technical documentation such as as-built drawings, product warranties, and...
Read More
An interior fitting contractor builds and installs all internal components of a commercial space, including walls, ceilings, flooring, joinery, and electrical rough-in. They convert an empty shell into a functional office, retail shop, or medical clinic. The primary value of...
Read More
Almost every commercial office fitout in Victoria requires a building permit and must be managed by a registered building practitioner. This ensures the project complies with the National Construction Code and safety regulations. The specific scope of your work determines...
Read More
The provided project process focuses on completing the build before the business moves into the space. The context does not explicitly detail strategies for operating a business within the same area during construction. The focus for maintaining business continuity is...
Read More